Page 3
1.1 Typographic Distinctions ................................................................................................... 6
1.2 Documentation .................................................................................................................. 6
1.3 Symbols in Use ................................................................................................................. 6
1.3.1 Specific Symbols related to Safety Instructions ............................................................. 6
1.3.2 General Symbols ............................................................................................................ 6
1.4 Intended Use ..................................................................................................................... 7
2.1 Guidelines for Safe Operation ........................................................................................... 8
2.1.1 Scope ............................................................................................................................. 8
2.1.2 Unit control ..................................................................................................................... 8
2.1.3 Unit Operation ................................................................................................................ 8
2.1.4 Mounting, dismantling, maintenance and repair of the unit ............................................ 9
2.1.5 Electrical ......................................................................................................................... 9
4.1 Mode of Action .................................................................................................................. 11
4.2 Mechanical Construction ................................................................................................... 11
4.3 Operating sequence .......................................................................................................... 12
5.1 Environment Parameters to be met and Mounting Recommendations ............................. 13
5.1.1 Dimensions and Mounting Directions ............................................................................. 14
5.2 Unit Installation Check ....................................................................................................... 16
5.3 Absorption Distance BN .................................................................................................... 17
5.3.1 Determining the Absorption Distance ............................................................................. 17
5.3.2 Absorption Distance Nomogram .................................................................................... 18
5.4 Steam Manifold ................................................................................................................. 19
5.4.1 General installation guidelines ....................................................................................... 19
5.4.2 Recommendations for dimensioning .............................................................................. 19
5.5 Steam line and condensate hose layout ........................................................................... 22
5.5.1 Guide lines for steam line design .................................................................................. 22
5.5.2 Condensate hose layout ................................................................................................. 22
5.5.3 Steam line and condensate hose installation types ....................................................... 23
6.1 Feed water quality ............................................................................................................. 24
6.2 Operation of electrode steam humidifier with softened water ........................................... 25
6.3 Water supply ..................................................................................................................... 25
6.4 Water discharge ................................................................................................................ 26
6.5 Water connections final check ........................................................................................... 27