Page 53
11.3.3 Menu tree
ESC
SET
SET
SET
SET
SET
SET
ESC
ESC
ESC
ESC
ESC
r01 Status
r02 Error
r03 Act. steam output [kg/h]
1)
r06 Filling level [mm]
7)
r08 External demand [%]
r09 Power limitation [%]
r10 Set point r.h. [%]
3)
r11 R.h. actual value [%]
3)
r12 External signal [%]
2-3 Switch stand-by blow dwn
2-2 Correction full blow-down
2-4 Duration stand-by bl. dwn
2-5 Switch dead leg flushing
3-1 Reset service interval
3-2 Reset K1 service Interval
3-3 Service interval
1
)
4-2 Gain PI controller
3)
4-3 Integral PI controller
3)
4-1 Set point r.h.
3)
6-1 Buzzer
6-2 Time-out
6-3 Activate imperial units
5-4 Basic relay
5-5 Optional Relay_K20
*)
5-6 Modbus address
1-1 Power reduction
1-3 Correction of input stage
1-4 Filter input stage
5)
1-Control
2-Blow-down
3-Service
4- Governing
5-Functions
6-Settings
2)
only when imperial system was selected
3)
only when „PI controller“ was selected
4)
only shown after code „10“ input
5)
direct access when on provider level
r07 Internal demand [%]
ESC
SET
User level
1)
only when SI system was selected
3-4 Service interval
2
)
Provider level
4)
5-2 Stand-by heating interval
5-3 Stand-by heating on
1-2 Control signal
2-1 Corr. partial blow-down
2-6 Interval dead leg flushing
2-7 Duration dead leg flushing
2-8 Blow-down without K1
5-1 Switch stand-by heating
designates scrolling with
control panel keys
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
r04 Act. steam output [lb/h]
2)
V
V
5-7 Optional Relay_K21
P00 Code level (2 digits)
PAr Parameter selection
4)
r13 V-Signal
r15
Ω
-Signal
r14 mA-Signal
r05 Actual current [A]
6)
6)
only for electrode steam humidifiers
7)
only for heater steam humidifiers
4-4 Control curves
6)