Page 71
030
Filling
Filling was not successful,
i.e. the expexted filling
level was not achieved
after a device-specific
time (15 - 45 min)
•
Soleneoid valve or water
supply line contaminated or
defective
•
Clean water supply line
and/or solenoid valve;
replace solenoid valve, if
defective
•
Solenoid valve defective
•
Make measurement on
solenoid; replace sole-
noid valve, if defective
•
Water supply not opened
•
Open water supply
•
Solenoid valve electrically
not driven
- electrical cabling not o.k.
- Main PCB relay not ener-
gised
-Check electrical cable
and replace, if required
- Measure voltage on
main PCB terminal 11
against N; replace PCB,
if required
•
Steam hose not laid with
sufficient incline/decline re-
sulting in a water bag ob-
structing steam flow. Steam
builts up pressure in steam
cylinder and pushes water
towards drain
•
Check steam hose lay-
out. Eliminate water bag.
•
L3 phase break-down
•
Main contactor does not
switch L3 phase
•
Reestablish L3 phase
feeding
•
Replace main contac-
tor
061
062
063
064
Blow-down fault
, relates
to:
Partial blow-down
Full blow-down
Dilution
Overcurrent blow-down
A partial/full/overcurrent/
dilution blow-down was
not successful
•
Blow-down pump not driv-
en
- electrical wiring not o.k.
- Main PCB relay not ener-
gised
- Check wiring and re-
place, if required
- Measure voltage on
main PCB terminal 10
against N; replace PCB,
required if
•
Blow-down pump defec-
tive
•
Replace blow-down
pump
•
Blow-down pump working
but water is not drained (i.e.
cylinder drain is blocked)
•
Clean cylinder and cyl-
inder base carefully to
ensure that no blocking
will occur in the near fu-
ture
•
Blow-down pump blocked
by hardeners
•
Check blow-down
pump, drainage system
and steam cylinder for
hardeners and clean
Icons
Code
Error message
Possible cause
Counter measure