Setup and Confi gurations
Installation of units and bridges
Multiple units installation with mast ties – pre-installation
(requires two twin mast adapters – sold separately)
Positioning the fi rst motorized unit
1-
Prepare the fi rst motorized unit and the area where the setup will be installed as
described in the general guidelines starting on p. 17.
2-
Lift and align the base of the motorized unit with the face of the work and lower it into position.
3-
Using the jacks on the lateral base extensions, level the mast on both its front and
side axis, then, if required, use metal shims to make sure that the base sits squarely
and level on the cribbing.
Installation of the bearing bridge structure
4-
Make sure the bearing bridge structure has been assembled as described in the
assembly instructions on p. 52 of the
Bridges
.
5-
Make sure that a twin mast adapter is installed at the end of the bearing bridge structure
to be attached to the fi rst motorized unit. For instructions on the installation of a twin
mast adapter, refer to p. 52 of the
Bridges
section. It is important to make sure that
the locking plates on the twin mast adapter remain in place until the installation of the
bearing bridge structure is complete.
6-
Using a rough terrain forklift, a crane or any other appropriate lifting device, lift the
bearing structure, align it with the motorized unit installed and lower it into position.
7-
Still holding the bearing bridge structure, bolt the twin mast adapter to the main frame
of the fi rst motorized unit. Make sure that the end of the bearing bridge that is not yet
bolted to a unit is
supported
.
Positioning the second motorized unit
8-
Prepare the second motorized unit and the area where the setup will be installed as
described in the general guidelines on p. 17.
D
The following installation steps can be used for
standard and
non-standard
confi gurations of tied installations with multiple units linked by a bearing
bridge
. For more information about the defi nition of a standard confi guration, refer to
p. 20 of this section. For more information about the combined use of equipment
and accessories in an installation, refer to the tables for the combinations allowed or
restricted in linked and unlinked confi gurations on p. 17 and p. 18 of this section.
Top of work
WARNING
It is important to make sure to plug in all inclinometers and to enable the
inclinometer option on each screen of the bearing bridge installation. It is
also essential to perform the 0-degree level adjustment for each inclinometer.
1
Pre-installation must be performed in a linked confi guration only. Once pre-installation is
complete, refer to p. 34 of this section for instructions on how to split a motorized
unit, if required and allowed.