Setup and Confi gurations
Multiple units installation with mast ties – pre-installation
(requires two twin mast adapters – sold separately)
WARNING
It is recommended that two persons handle all rise and descent operations of
each motorized unit and that at least
one
of those two persons is a
qualifi ed
operator
. It is important to coordinate the motion of motorized units linked by a
bearing bridge to keep the structure as level as possible.
WARNING
It is important to make sure to plug in all inclinometers and to enable the
inclinometer option on each display screen of the bearing bridge installation. It is
also essential to perform the 0-degree level adjustment for each inclinometer.
3
Completing the multiple units installation
Installation of the bearing bridge structure
1-
Make sure the bearing bridge structure has been assembled as described in the
assembly instructions on p. 52 of the
Bridges
section.
2-
Make sure that the twin mast adapters are installed at each end of the bearing bridge
structure. For instructions on the installation of a twin mast adapter, refer to p. 52 of
the
Bridges
section. It is important to make sure that the locking plates on the twin mast
adapters remain in place until the installation of the bearing bridge structure is complete.
3-
Proceed with the installation of the bearing bridge structure following the installation
instructions on p. 53 of the
Bridges
section. Once the installation of the structure is
complete, make sure the lock plates have been unhooked on each twin mast adapter.
Installation of additional bridges, equipment and accessories
4-
With the unit at base level, install as many additional cantilevers as is required and
allowed. Refer to the
Load Capacities
section on p. 94 for the maximum number of
bridges allowed in a setup.
5-
Install additional equipment and accessories as is required and allowed. For more
information about the combined use of equipment and accessories in an installation,
refer to the tables for the combinations allowed or restricted in linked and unlinked
confi gurations on p. 17 and p. 18 of this section. For instructions on the installation
and use of an extension bridge or a swivel bridge, refer to the
Bridges
section on p. 50.
For instructions on the installation and use of any other accessory such as a monorail
or weather protection, refer to the
Accessories
section on p. 123.
Installation of outriggers and planking
6-
Adjust the outriggers and install planks, as required and allowed (see p. 111 of the
Accessories
section for more information).
Verifi cation of the setup
7-
Make a fi nal verifi cation of the setup before authorizing workers to use the motorized
unit. Make sure that all the guardrails are in place and secure (see p. 108 of the
Accessories
section for more information about guardrails). In all cases where workers
are exposed to fall hazards greater than specifi ed by local regulations, the installation
of guardrails or face guardrail supports is
mandatory
.
8-
Before authorizing workers to use the motorized unit, perform every step in the daily
inspection checklist. It is recommended to fi ll out the handover sheet to complete the
installation. Refer to p. 134 of the
Transport, Storage and Maintenance
section for
more information about the daily inspection checklist and to p. 136 for information
about the handover sheet.
WARNING
When weather protection is required and allowed, tarps and shields must only be
installed once all tie levels are in place up to the top of the work.