Installation 29
3.
Attach the ERM connector bracket to the UPS as a cord retention bracket for the ERM cable.
4.
To install a second ERM:
a.
Remove the ERM connector bracket from the first ERM.
b.
Connect the cable from the second ERM into the socket at the rear of the first ERM. Up to two
ERM units can be connected.
c.
Attach the ERM connector bracket to the first ERM as a cord retention bracket for the ERM cable.
Switching on the ERM circuit breaker
Charging the ERM batteries
Connect the UPS to a grounded utility power outlet. When the UPS is plugged in, the unit automatically
enters Standby mode and begins charging the ERM batteries. Allow 48 hours for the ERM to fully charge.
Summary of Contents for R/T3000 G2
Page 18: ...Installation 18 ...
Page 27: ...Installation 27 Attaching the ERM front bezel ...
Page 38: ...Installation 38 Installing the extension bars if included ...
Page 39: ...Installation 39 Connecting and securing the power cords ...
Page 71: ...Support and other resources 71 ...
Page 72: ...Support and other resources 72 ...
Page 79: ...Index 79 W website Hewlett Packard Enterprise 65 weight ERM 60 weight UPS 60 ...