2-10
Library Installation
Moving or Shipping the Library
Moving or Shipping the Library
To move or ship the library:
1. Properly shut down and power off the host.
2. Remove the cartridges (see software package documentation).
3. Verify that the drives are empty (
displays after the drive number).
4. Turn off the power switch on the front of the library.
5. Remove the back cosmetic panel (lift up on the bottom of the panel, then
pull it away).
6. Remove the power cord and the SCSI cables.
7. Raise the leveler feet (use a 1/2-inch wrench).
8. Transport the library:
•
To move the library a short distance, carefully roll the library to its
new destination.
•
To ship the library, repackage the library in the same materials and
ship it in the same manner in which it was received, then unpack it at
its new destination.
CAUTION
The library can be seriously damaged if it is not shipped using appropriate
shipping materials. A service representative can provide assistance or advice
on how to best repackage and ship the library.
9. Lower the leveler feet.
10. Re-install the library. Refer to installation steps 3 through 6 in this
chapter.
Summary of Contents for Surestore Tape Library Model 2/28
Page 4: ...iv ...
Page 8: ...viii Contents ...
Page 10: ...x Figures ...
Page 12: ...xii Tables Table 4 14 Troubleshooting 4 47 Table A 1 Basic Supplies and Accessories A 3 ...
Page 13: ...1 1 1 Product Description ...
Page 29: ...2 1 2 Library Installation ...
Page 39: ...3 1 3 Tape Cartridges ...
Page 45: ...4 1 4 Library Operation ...
Page 94: ...4 50 Library Operation Troubleshooting ...
Page 95: ...A 1 A Supplies and Accessories ...