Installing the Server in a Rack
8-24
HP ProLiant DL580 Generation 2 Server Setup and Installation Guide
HP CONFIDENTIAL
Writer: Karen Hale File Name: i-ch8 Installing the Server in a Rack.doc
Codename: Wave Part Number: 230835-003 Last Saved On: 6/26/03 9:41 AM
3.
Secure the cables to the inside of the cable management arm using the Velcro
straps.
Figure 8-22: Securing cables to the cable management
arm
4.
Close the cable management arm and finish securing the cables.
Figure 8-23: Closing the cable management arm
5.
Secure the server to the rack.