Installing the Server in a Rack
Figure 8-18: Sliding the server forward in the rack
2.
Align the keyholes on the cable management arm with the posts on the server (1),
and then secure with the thumbscrew (2).
Figure 8-19: Attaching the cable management arm to
the server
8-22
HP ProLiant DL580 Generation 2 Server Setup and Installation Guide
HP CONFIDENTIAL
Writer: Karen Hale File Name: i-ch8 Installing the Server in a Rack.doc
Codename: Wave Part Number: 230835-003 Last Saved On: 6/26/03 9:41 AM