Installing the Server in a Rack
To identify the required space and location for the server with the template:
1.
Identify the front side of the template.
2.
Starting at the bottom of the rack, or at the top of a previously mounted
component, secure the template against the front of the rack by pressing the two
push tabs. Match the hole pattern on the template with the holes on the vertical
rails of the rack.
Figure 8-1: Measuring with the template
3.
Align the template so that the sides of the template are even with the sides of the
rack. Tick marks on the vertical rails of the rack help you maintain the proper
alignment.
NOTE:
Tick marks on the vertical posts of the rack mark off U-spaces in the rack
configuration and help to maintain the proper alignment.
8-4
HP ProLiant DL580 Generation 2 Server Setup and Installation Guide
HP CONFIDENTIAL
Writer: Karen Hale File Name: i-ch8 Installing the Server in a Rack.doc
Codename: Wave Part Number: 230835-003 Last Saved On: 6/26/03 9:41 AM