Cabling Verification
The cabling for a factory-integrated system is complete. You must plug in the power cords and
install the host and Ethernet cables.
NOTE:
In a 4-node 8400/8440/8450 system, two cable management brackets have Velcro
straps to hold the cables. You can remove and discard these brackets, but Hewlett Packard
Enterprise recommends saving them for future use. To remove the cable management brackets,
loosen the Torx screws and unlatch the Velcro straps to free the cabling.
Cable Restraint Shipping Brackets installation and removal
The cable restraint shipping brackets support the connected data cables and connectors during
transport. Hewlett Packard Enterprise recommends installing the brackets before transporting
the system to another location to prevent damage to the connectors. The brackets are not required
if the system is in a stationary position, so remove and store the brackets for later use.
Installing Cable Restraint Shipping Brackets
1.
Connect the data cables to the enclosure.
2.
Attach the hook and loop straps to the brackets.
3.
Align the brackets so that they are parallel to the edges of the enclosure link connectors
(see
). Adjust the brackets to the height of the screw holes located on
the side rails.
Figure 54 Aligning cable restraint shipping brackets
56
Hewlett Packard Enterprise Factory-Integrated System Setup