Chapter 9
253
Performance Verification Tests
14. Spurious Responses
Cable, SMA, 61-cm (24-in) (2 required)
Cable, BNC, 120-cm (48-in)
Adapter, Type-N (m) to SMA (f) (4 required)
Adapter, Type-N (m) to Type-N (m)
Adapter, Type-N (m) to BNC (f)
Adapter, SMA (m) to Type-N (m)
Additional Equipment for 75
Ω
Input
Power sensor, 75
Ω
Adapter, mechanical, 75
Ω
to 50
Ω
Pad, minimum loss
Adapter, Type-N (m), to BNC (m), 75
Ω
Procedure
This performance test consists of two parts:
Part 1: Second Harmonic Distortion, 40 MHz
Part 2: Third Order Intermodulation Distortion
Perform Part 1 before Part 2.
Summary of Contents for ESA-L1500A
Page 12: ...11 1 Preparing for Use and Printing ...
Page 28: ...27 2 Getting Started ...
Page 47: ...46 Chapter2 Getting Started Analyzer Battery Information ...
Page 48: ...47 3 Troubleshooting ...
Page 54: ...Chapter 3 53 Troubleshooting How to Return Your Analyzer for Service Figure 3 1 ...
Page 117: ...116 Chapter4 Front Panel Key Reference Trig ...
Page 118: ...117 5 Menu Maps ...
Page 119: ...118 Chapter5 Menu Maps ...
Page 120: ...Chapter 5 119 Menu Maps ...
Page 121: ...120 Chapter5 Menu Maps ...
Page 122: ...Chapter 5 121 Menu Maps ...
Page 124: ...Chapter 5 123 Menu Maps ...
Page 125: ...124 Chapter5 Menu Maps ...
Page 128: ...Chapter 5 127 Menu Maps ...
Page 129: ...128 Chapter5 Menu Maps ...
Page 130: ...Chapter 5 129 Menu Maps ...
Page 131: ...130 Chapter5 Menu Maps ...
Page 135: ...134 Chapter5 Menu Maps ...
Page 136: ...135 6 Options and Accessories ...
Page 145: ...144 Chapter6 Options and Accessories Accessories ...
Page 146: ...145 7 Specifications ...
Page 179: ...178 Chapter7 Specifications Regulatory Information ...
Page 180: ...179 8 Required Equipment ...
Page 187: ...186 Chapter8 Required Equipment Test Equipment ...
Page 308: ...307 10 Performance Verification Test Record ...