Chapter 9
197
Performance Verification Tests
3. Noise Sidebands
Procedure
This performance test consists of four parts:
Part 1: Noise Sideband Suppression at 10 kHz
Part 2: Noise Sideband Suppression at 20 kHz
Part 3: Noise Sideband Suppression at 30 kHz
Part 4: Noise Sideband Suppression at 100 kHz
Perform part 1 before performing part 2 or part 3 of this procedure.
A worksheet is provided at the end of this procedure for calculating the
noise sideband suppression.
Part 1: Noise Sideband Suppression at 10 kHz
1. Perform the following steps to set up the equipment:
a. Set the synthesized signal generator controls as follows:
FREQUENCY
,
500 MHz
AMPLITUDE
,
0 dBm
(50
Ω
Input only)
AMPLITUDE
,
to +6 dBm
(75
Ω
Input only)
AM OFF
FM OFF
b. Connect the equipment as shown in
Figure 9-2
.
c. Press
Preset
on the analyzer, then wait for the preset routine to
finish. Set the analyzer by pressing the following keys:
Frequency
,
500 MHz
Span
,
10 MHz
Amplitude, Amptd Units, dBm
Done
2. Press the following analyzer keys to measure the carrier amplitude.
Peak Search
Frequency
,
Signal Track On Off
(On)
Span
,
50 kHz
BW/Avg
,
1 kHz
Video BW Auto Man
,
30 Hz
Frequency
,
Signal Track On Off
(Off)
Sweep, Sweep Time, 5 sec
Summary of Contents for ESA-L1500A
Page 12: ...11 1 Preparing for Use and Printing ...
Page 28: ...27 2 Getting Started ...
Page 47: ...46 Chapter2 Getting Started Analyzer Battery Information ...
Page 48: ...47 3 Troubleshooting ...
Page 54: ...Chapter 3 53 Troubleshooting How to Return Your Analyzer for Service Figure 3 1 ...
Page 117: ...116 Chapter4 Front Panel Key Reference Trig ...
Page 118: ...117 5 Menu Maps ...
Page 119: ...118 Chapter5 Menu Maps ...
Page 120: ...Chapter 5 119 Menu Maps ...
Page 121: ...120 Chapter5 Menu Maps ...
Page 122: ...Chapter 5 121 Menu Maps ...
Page 124: ...Chapter 5 123 Menu Maps ...
Page 125: ...124 Chapter5 Menu Maps ...
Page 128: ...Chapter 5 127 Menu Maps ...
Page 129: ...128 Chapter5 Menu Maps ...
Page 130: ...Chapter 5 129 Menu Maps ...
Page 131: ...130 Chapter5 Menu Maps ...
Page 135: ...134 Chapter5 Menu Maps ...
Page 136: ...135 6 Options and Accessories ...
Page 145: ...144 Chapter6 Options and Accessories Accessories ...
Page 146: ...145 7 Specifications ...
Page 179: ...178 Chapter7 Specifications Regulatory Information ...
Page 180: ...179 8 Required Equipment ...
Page 187: ...186 Chapter8 Required Equipment Test Equipment ...
Page 308: ...307 10 Performance Verification Test Record ...