Installation procedures—All deployments
34
d.
Loosen the locking nut on the shipping retaining bracket and slide the bracket to the farthest
position on the rear of the rail.
e.
Repeat steps a through d for the left rack rail.
4.
Install the component in the rack:
a.
Remove the bezel from the front of the device, align the device with the rails, and slide it into
the rack.
2
1
Summary of Contents for AD510A - StorageWorks Modular Smart Array 1500 cs 2U Fibre Channel SAN Attach Controller Shelf Hard Drive
Page 60: ...Installation procedures All deployments 60 ...
Page 66: ...Configuration procedures Windows environments 66 ...
Page 72: ...Configuration procedures Linux environments 72 ...
Page 78: ...Configuration procedures HP UX environments 78 ...
Page 84: ...Configuration procedures OpenVMS environments 84 ...
Page 96: ...Configuration procedures Other environments 96 ...
Page 100: ...Powering off and powering on the MSA 100 ...
Page 106: ...Electrostatic discharge 106 ...
Page 126: ...126 ...