Installing and Configuring the Edge Switch 2/24
50
Edge Switch 2/24 Installation Guide
Unpack and Inspect the Switch
This section provides instructions for unpacking and inspecting the Edge
Switch 2/24 prior to installing it in a desktop or rack-mount configuration.
To unpack and inspect the switch:
Caution:
When you remove the Edge Switch from the carton, do not rest it on
its rear window while examining it. To do so may break the FRU handles.
1. Inspect the shipping containers for damage caused during transit. If a
container is damaged, ensure that a representative from the freight carrier is
present when the container is opened.
2. Unpack the shipping containers and inspect each item for damage. Save all
shipping and packing materials. Ensure that all items on the enclosed shipping
list are in each container.
3. If any items are damaged or missing, customers should contact an
HP-authorized service provider or reseller.
Summary of Contents for 316095-B21 - StorageWorks Edge Switch 2/24
Page 10: ...Contents 10 Edge Switch 2 24 Installation Guide ...
Page 18: ...About this Guide 18 Edge Switch 2 24 Installation Guide ...
Page 38: ...Switch Features 38 Edge Switch 2 24 Installation Guide ...
Page 46: ...Rack Mount Instructions 46 Edge Switch 2 24 Installation Guide ...
Page 96: ...Installing and Configuring the Edge Switch 2 24 96 Edge Switch 2 24 Installation Guide ...
Page 116: ...Using the Embedded Web Server 114 Edge Switch 2 24 Installation Guide ...
Page 128: ...Manage Firmware Versions 124 Edge Switch 2 24 Installation Guide ...
Page 154: ...Index 150 Edge Switch 2 24 Installation Guide ...