![horsch Terrano 4.3 GX Operating Instructions Manual Download Page 78](http://html1.mh-extra.com/html/horsch/terrano-4-3-gx/terrano-4-3-gx_operating-instructions-manual_2164127078.webp)
8 | Operation
78
60084498 • 01 • 06/2022 • en
All Terrano machine types
4. Lower the undercarriage to lift the machine.
5. Adjust the oil flow rate on the control unit of the tractor.
6. Slow the control unit before the machine components reach the stop position.
7. Operate the control unit and completely unfold or fold in the machine.
8.3 Depth setting
Depth guidance
In the field the machine is guided in the depth by the packer and support wheels.
NOTE
The coulters’ loosing action differs according to the soil conditions.
As a result, the packer sinks to different depths.
The intended working depth can therefore not be clearly set before
use in the field.
Ø
The working depth must be checked before starting work and, when pro-
cessing larger areas, also in between.
Ø
Correct the adjustments if necessary.
Hydraulic depth setting
The adjustment of the working depth is done via the hydraulic cylinders on the sup-
port wheels.
In the field, the support wheels guide the machine in the depth.
Hydraulic depth setting/depth setting with scale
Summary of Contents for Terrano 4.3 GX
Page 2: ......
Page 111: ...60084498 01 06 2022 en 111 Notes...
Page 112: ...112 60084498 01 06 2022 en...
Page 113: ......