LCN System Installation
7-2
9/96
7.1
• Make sure that each LCN module power cord is plugged in and that the margin-test
jumper is in the normal (center) position.
• Turn the power switch ON on each module, one at a time, and check that the green
POWER STATUS LED is on. Remember that a Dual Node Module may have two
power switches. Correct any problems before proceeding to the next module. Refer to
the Five/Ten-Slot Service manual or Dual Node Module Service manual if service is
required.
• A Deskside Global User Station has a power-on LED on the front of the electrics tower
for deskside models, and an LED on the front of the console module located at the rear
of the station.
Summary of Contents for TotalPlant LCN
Page 1: ...LCN System Installation SW20 500 ...
Page 2: ......
Page 3: ...LCN Installation LCN System Installation SW20 500 Release 510 CE Compliant 9 96 ...
Page 10: ...LCN System Installation iv 9 96 ...
Page 16: ...LCN System Installation 2 4 9 96 ...
Page 42: ...LCN System Installation 4 6 9 96 ...
Page 50: ...LCN System Installation 6 2 9 96 ...
Page 58: ...LCN System Installation 8 6 9 96 ...
Page 60: ...LCN System Installation 9 2 9 96 ...
Page 68: ...LCN System Installation 11 2 9 96 ...
Page 70: ...LCN System Installation 12 2 9 96 ...
Page 83: ...LCN System Installation 15 5 9 96 15 7 15052 Figure 15 6 Mounting of an Two LCN MAUs ...
Page 84: ...LCN System Installation 15 6 9 96 ...
Page 112: ...LCN System Installation B 6 9 96 ...
Page 128: ...LCN System Installation Index 4 9 96 ...
Page 130: ......
Page 131: ......