S7999D1048 COMBUSTION SYSTEM OPERATOR INTERFACE DISPLAY
27
65-0321—01
Initiate Commissioning
Begin commissioning/configuring the ControLinks™ Control
device by clicking on the Commissioning button located on the
Home page. The Warning screen (Fig. 46) will appear.
You can perform the following actions from this screen:
1.
Enter your password to access the commissioning
function of the S7999D.
2.
Change the password.
3.
Monitor.
After reading the warning and accepting the responsibility for
configuring a safe and efficient fuel/air profile curve, click on
the Commission button to exit the Warning screen and display
the Commission Password screen.
Commission Warning Screen
The Commission Warning screen is used to:
• Protect the system from unauthorized users.
• Connect the R7999 to the S7999D for commissioning. Refer
to the R7999A,B ControLinks™ controller specification
sheet (Form No. 65-0238).
Fig. 46. Commission warning.
12.k.
Press Open and Close for Fuel and Air and the FGR (if present)
to move the cursor to the Maximum Modulation point for the
burner.
For gas systems of which the gas pressure has not
been adjusted to match the burner-rated BTU
capability, the use should use the maximum
Modulation replacement technique to rough in a curve
until maximal airflow is obtained. The gas flow may
then be adjusted to set the maximum firing rate. The
user may then delete all points and immediately
re-enter another maximum modulation point. This
may save the user some time by not having to
successively delete invalid intermediate points due to
the gas pressure change.
12.l.
Press Max button.
An “M” will be displayed on the profile and a line will
connect it to the previous intermediate points. The
R7999 requires re-verification of any verified curve
segments after setting the maximum modulation
point.
12.m. Press Prev. Point/Next Point until the cursor reaches the next
lower point on the profile. Alternatively the user may add
intermediate points as the effective firing rate is lowered. Jump
back to 12.h. if the temporary intermediate points were deleted in
12.k.
The line segment turns color, red to green, to indicate
the curve has been walked (verified). FGR line
segment turns color from brown to cyan.
NOTE: The S7999D requires you to enter at least
three points (inclusive of the min and
max modulation points) in order to use
the “Prev Point” and “Next Point” but-
tons.
12.n.
Repeat step 12.m. until you have moved along the curve from top
to bottom.
The profile is now complete and operational. Status
should display “Profile Complete. Ready to Run.”
The R7999 requires reverification of any line segment
after the maximum modulation point has been altered.
13.a.
If you wish to save the profile you have just created, press
Quit
button and then the
Save
button.
The user must insure that the purge point is within the
minimum and maximum modulation points before
finishing the profile. The purge point can be moved
while the burner is firing by simply using the Prev
Point, Next Point buttons and pressing the PURGE
button at the desired level or at the purge point
definition period during the next start up sequence.
13.b. When you are through with the profile, press
Quit
and then the
Finish
button.
The Monitor screen appears. You have successfully
commissioned the R7999.
Table 4. Commissioning Overview. (Continued)
Step
Action
Notes
Summary of Contents for S7999D1048
Page 70: ...S7999D1048 COMBUSTION SYSTEM OPERATOR INTERFACE DISPLAY 65 0321 01 70 ...
Page 72: ...S7999D1048 COMBUSTION SYSTEM OPERATOR INTERFACE DISPLAY 65 0321 01 72 ...
Page 74: ...S7999D1048 COMBUSTION SYSTEM OPERATOR INTERFACE DISPLAY 65 0321 01 74 ...
Page 75: ...S7999D1048 COMBUSTION SYSTEM OPERATOR INTERFACE DISPLAY 75 65 0321 01 ...