3
INSTALLATION
40
RM640
www.honeywellprocess.com
34-VF-25-131 iss.1 GLO Feb 2019 US
Equipment needed:
•
Device
•
Orientation system (accessory)
•
ISO 228-1 (G) connection:
ISO 228-1 (G) connection:
ISO 228-1 (G) connection:
ISO 228-1 (G) connection: Gasket (not supplied)
•
NPT connection:
NPT connection:
NPT connection:
NPT connection: PTFE threaded seal tape (not supplied)
•
G 1
G 1
G 1
G 1
½
or 1
or 1
or 1
or 1
½
NPT connection:
NPT connection:
NPT connection:
NPT connection: 50 mm open-end wrench (not supplied)
•
G 3 or 3 NPT connection:
G 3 or 3 NPT connection:
G 3 or 3 NPT connection:
G 3 or 3 NPT connection: 65 mm open-end wrench (not supplied)
•
3 mm Allen wrench (not supplied)
•
If the device does not have an antenna extension, remove the locking screw from the top of the
antenna with a 3 mm Allen wrench. If the device has one or more antenna extensions, remove
the locking screw from the top antenna extension and remove the antenna and the antenna
extensions from the part below the flange.
•
Remove the antenna from the part below the flange (if there are no antenna extensions).
i
The antenna is not attached to the device.
•
ISO 228-1 (G) connection:
ISO 228-1 (G) connection:
ISO 228-1 (G) connection:
ISO 228-1 (G) connection: Make sure that you use the applicable gasket for the connection
dimensions and the process. Align the gasket correctly. Put the device carefully on the
orientation system. Turn the threaded connection to attach the device to the orientation
system. Tighten the connection to the correct torque (not more than 40 N
·
m / 29.5 lbf
·
ft) with a
50 mm (G 1
½
) or 65 mm (G 3) open-end wrench.
•
NPT connection:
NPT connection:
NPT connection:
NPT connection: Wind the thread seal tape around the process connection of the device in
agreement with good engineering practice. Put the device carefully on the orientation system.
Turn the threaded connection to attach the device to the orientation system. Tighten the
connection to the correct torque (not more than 40 N
·
m / 29.5 lbf
·
ft) with a 50 mm (1?
½
NPT)
or 65 mm (3 NPT) open-end wrench.
•
Attach the antenna.
•
Attach and tighten the locking screw.
i
End of the procedure.
WARNING!
Do not tighten the process connection to a torque more than 40 N
·
m / 29.5 lbf
·
ft. If the
connection is too tight, this will damage the thread.
Summary of Contents for RM640
Page 4: ...4 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ABOUT THIS DOCUMENT RM640 ...
Page 20: ...1 SAFETY INSTRUCTIONS 20 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...
Page 56: ...4 ELECTRICAL CONNECTIONS 56 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...
Page 120: ...6 OPERATION 120 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...
Page 182: ...10 APPENDIX 182 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...
Page 183: ...APPENDIX 10 183 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...