SERVICE
7
125
RM640
www.honeywellprocess.com
34-VF-25-131 iss.1 GLO Feb 2019 US
•
De-energize the SmartLine
®
RM60.
•
Remove the terminal compartment cover and loosen the cable glands.
•
Disconnect the electrical wires from the terminals. Remove the wires from the terminal
compartment. Attach the terminal compartment cover.
•
Loosen the lock screw at the bottom of the signal converter with a 5 mm Allen wrench.
•
Remove the signal converter from the process connection.
Procedure 2: How to remove the signal converter (SmartLine
®
RM60 radar level
transmitter)
Figure 7-3: Procedure 2: How to remove the signal converter (SmartLine
®
RM60 radar level transmitter)
1
Terminal compartment
2
Cable glands
3
Lock screw
4
Signal converter
5
Process connection
INFORMATION!
For more data about electrical connection procedures, refer to Electrical installation: output
options with cable gland on page 48
.
Summary of Contents for RM640
Page 4: ...4 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ABOUT THIS DOCUMENT RM640 ...
Page 20: ...1 SAFETY INSTRUCTIONS 20 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...
Page 56: ...4 ELECTRICAL CONNECTIONS 56 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...
Page 120: ...6 OPERATION 120 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...
Page 182: ...10 APPENDIX 182 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...
Page 183: ...APPENDIX 10 183 RM640 www honeywellprocess com 34 VF 25 131 iss 1 GLO Feb 2019 US ...