Upgrading a Hitachi Unified Storage 130 system
15–31
Hitachi Unified Storage Hardware Service Guide
Figure 15-18: READY LED on DBSS and DBL Drive Boxes
For DBX Drive Boxes, verify that the:
a. Green READY LED on the front bezel goes ON (usually five minutes
after attaching power cables). See
b. LED above the rear panel Drive Box ports goes ON when the port
links up.
Figure 15-19: READY LED on DBX Drive Box
For DBW Drive Boxes, turn on all Power Units and verify the following:
a. Green Power OK LED goes ON (see
b. DBW Power Unit goes ON.
Figure 15-20: Power OK LED and Switch on DBW Drive Box
READY LED
READY LED
READY LED
Power OK LED
Switch
Summary of Contents for CBL
Page 20: ...xx Hitachi Unified Storage Hardware Service Guide Labels on the CBXSS ...
Page 30: ...xxx Hitachi Unified Storage Hardware Service Guide CBL CBLE CBLD DBS DBSD DBL DBLD DBF ...
Page 39: ...xxxix Hitachi Unified Storage Hardware Service Guide Out ...
Page 40: ...xl Hitachi Unified Storage Hardware Service Guide ...
Page 152: ...5 8 Replacing a cache backup battery Hitachi Unified Storage Hardware Service Guide ...
Page 156: ...6 4 Replacing a Fan Module Hitachi Unified Storage Hardware Service Guide ...
Page 180: ...8 16 Adding and replacing controllers Hitachi Unified Storage Hardware Service Guide ...
Page 188: ...9 8 Replacing cache memory Hitachi Unified Storage Hardware Service Guide ...
Page 200: ...11 6 Replacing the Host connector Hitachi Unified Storage Hardware Service Guide ...
Page 204: ...12 4 Replacing the Drive I O Module Hitachi Unified Storage Hardware Service Guide ...
Page 212: ...14 4 Replacing the SAS ENC cable Hitachi Unified Storage Hardware Service Guide ...
Page 274: ...17 14 Troubleshooting Hitachi Unified Storage Hardware Service Guide ...
Page 291: ...1 Hitachi Unified Storage Hardware Service Guide ...