12/24/07
888-2685-001
4-31
WARNING: Disconnect primary power prior to servicing.
Section 4 RF Testing
Ranger Commissioning Manual
4.2.15.7 Linear Precorrection Test Results
The following plots show the typical results:
Figure 4-19 Group Delay Plot 1
Expected results
Result
Residual Group Delay < 1 usecs with Exciter A
PASS FAIL
Residual Group Delay < 1 usecs with Exciter B
PASS FAIL
Amplitude Variations , 1 dB with Exciter A
PASS FAIL
Amplitude Variations , 1 dB with Exciter B
PASS FAIL
Group delay
-0.5
0
0.5
1
1.5
2
2.5
3
0
500
1000
1500
2000
2500
3000
3500
4000
Channel
G
rou
p d
e
la
y
(
u
S)
Run# 1
Run# 2
Run# 3
Run# 4
Run# 5
Run# 6
Run# 7
Run# 8
Run# 9
Run# 10
Summary of Contents for Ranger Series
Page 4: ...888 2685 001 12 24 07 WARNING Disconnect primary power prior to servicing MRH 2...
Page 5: ...12 24 07 888 2685 001 WARNING Disconnect primary power prior to servicing...
Page 7: ......
Page 9: ...12 24 07 888 2685 001 WARNING Disconnect primary power prior to servicing...
Page 11: ......
Page 12: ...888 2685 001 12 24 07 WARNING Disconnect primary power prior to servicing...