5 - Operation
99
Transport Lock
A cone-shaped mandrel (P) is connected to the boom structure on both
sides of the boom centre.
When the boom is folded correctly into transport position, the mandrels
sit in the chassis. At this position the boom is locked against moving
sideways when driving and locked against unintended
folding/unfolding.
The boom must rest on the rubber pads (O) during transport.
€
DANGER! The transport locks must both be locked correctly
before road transport. If not, there is a risk of unintentional boom
movements when driving, which can lead to road accidents!
Night Spraying Light
The night spraying light is activated in the controller:
1.
Press
to enter the options menu.
2.
Press
to enter the Night Spraying Light menu.
3.
Press
to turn On the night spraying lights.
4.
Press
to turn Off lights again.
Summary of Contents for NAVIGATOR VPZ
Page 4: ...1 EU Declaration 4...
Page 72: ...3 Description 72...
Page 135: ...6 Maintenance 135 Lubrication Plan Boom Wings 10...
Page 174: ...6 Maintenance 174...
Page 182: ...7 Fault Finding 182...
Page 195: ...8 Technical Specifications 195 Hydraulic Diagrams Hydraulics for Boom of 21 24 Meters...
Page 196: ...8 Technical Specifications 196 Hydraulics for Boom of 27 28 Meters...
Page 198: ...8 Technical Specifications 198...
Page 204: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 N rre Alslev DENMARK...