![Hardi NAVIGATOR VPZ Instruction Book Download Page 143](http://html1.mh-extra.com/html/hardi/navigator-vpz/navigator-vpz_instruction-book_3945425143.webp)
6 - Maintenance
143
10 Hours Service - Spraying Circuit
Fill with clean water and operate all functions.
Check for leaks using a higher spray pressure than normal.
Check nozzle spray patterns visually using clean water.
10 Hours Service - Brakes
Apply brake pedal and check function of trailer brakes.
10 Hours Service - Air Tank for Brakes
Drain the air tank for condensed water by opening the drain valve.
50 Hours Service - Greasing the Pump
When operating the pump, it must be greased every 50 hours with 30
grams of grease into each lubrication point.
μ
ATTENTION! In order to avoid excessive wear, it is important to
use a recommended lubricant! See the section “Recommended
Lubricants” for more information.
μ
ATTENTION! The pump MUST be stopped during greasing!
50 Hours Service - Transmission Shaft (PTO)
1.
Check function and condition of the transmission shaft protection
guard. Replace any damaged parts.
2.
Lubrication. See “Lubrication and Oiling Plan - PTO” on page 137.
Summary of Contents for NAVIGATOR VPZ
Page 4: ...1 EU Declaration 4...
Page 72: ...3 Description 72...
Page 135: ...6 Maintenance 135 Lubrication Plan Boom Wings 10...
Page 174: ...6 Maintenance 174...
Page 182: ...7 Fault Finding 182...
Page 195: ...8 Technical Specifications 195 Hydraulic Diagrams Hydraulics for Boom of 21 24 Meters...
Page 196: ...8 Technical Specifications 196 Hydraulics for Boom of 27 28 Meters...
Page 198: ...8 Technical Specifications 198...
Page 204: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 N rre Alslev DENMARK...