5 - Operation
87
Quick Reference - Cleaning
ATTENTION! Pump speed 560 rpm.
A.
Full agitation.
B.
Spray until air comes out of nozzles. Engage FlexCapacity pump.
When the pressure drops, close the regulation valve by pressing the
button on the SetBox until
yellow LED lights on the valve (this can take up to 10 seconds).
Press “auto” to have the system remove pressure spikes automatically before next start-up.
C.
Minimum 45 seconds with nozzles OFF.
D.
Spray until air comes out of nozzles.
A
1/3
4 x 1/6
4 x 1/6
B
C
D
Summary of Contents for COMMANDER 5500
Page 2: ......
Page 4: ......
Page 10: ...Table of Contents 8 ...
Page 12: ...1 Welcome 10 ...
Page 48: ...3 Description 46 ...
Page 96: ...5 Operation 94 ...
Page 99: ...6 Maintenance 97 Lubrication and Oiling Plan Boom Width 80 100 10 10 10 C 500 C 50 C 50 10 ...
Page 100: ...6 Maintenance 98 Lubrication and Oiling Plan Boom Width 120 10 C 500 C 50 10 ...
Page 129: ...6 Maintenance 127 At the same time adjust the two stop bolts to align the boom sections ...
Page 142: ...6 Maintenance 140 ...
Page 162: ...8 Technical Specifications 160 ...
Page 168: ...Index 166 ...
Page 169: ......