4 - Sprayer Setup
59
Moving the Guide Rods at the Bottom
To make the boom even more passive, move the two guide rods at the
bottom of the boom center.
1.
Loosen the nuts below both rod connections next to the free hole
(see arrow).
2.
Move the rods to the free hole position.
3.
Mount the nuts with a torque of 185 Ft/lb (250 Nm).
÷
These guide rods angle outwards, which is opposite to the guide
rods at the top.
Moving the Guide Rods at the Top
Tools Needed
1.
Loosen the nuts below both rod connections next to the free
hole (see arrows).
Torque wrench, size 27 mm
2.
Move the rods to the free hole position.
3.
Mount the nuts with a torque of 185 Ft/lb (250 Nm).
Summary of Contents for COMMANDER 5500
Page 2: ......
Page 4: ......
Page 10: ...Table of Contents 8 ...
Page 12: ...1 Welcome 10 ...
Page 48: ...3 Description 46 ...
Page 96: ...5 Operation 94 ...
Page 99: ...6 Maintenance 97 Lubrication and Oiling Plan Boom Width 80 100 10 10 10 C 500 C 50 C 50 10 ...
Page 100: ...6 Maintenance 98 Lubrication and Oiling Plan Boom Width 120 10 C 500 C 50 10 ...
Page 129: ...6 Maintenance 127 At the same time adjust the two stop bolts to align the boom sections ...
Page 142: ...6 Maintenance 140 ...
Page 162: ...8 Technical Specifications 160 ...
Page 168: ...Index 166 ...
Page 169: ......