6 - Maintenance
131
11.
Fully extract the hydraulic cylinder by applying hydraulic pressure.
•
Now increase the distance E by turning the rod the opposite way, until Stop D is touching the steel boom.
•
Keep the gap of 1-2 mm between Stop C and the aluminum boom.
12.
Continue to increase the distance E, until stop C is touching the aluminum boom.
•
Keep the hydraulic cylinder fully extracted - it must not retract when adjusting the double ram eye.
•
Keep turning the ram eye rod 3 turns.
•
Tighten the nuts on the ram eye rod with a wrench with extension.
13.
The force of the hydraulic cylinder can cause misalignment of the boom.
If needed, adjust Stop C and D once more to touch the opposite boom section.
14.
With the boom perfectly straight, now tighten the nuts firmly on Stops C and D and on the double ram eye.
Summary of Contents for COMMANDER 5500
Page 2: ......
Page 4: ......
Page 10: ...Table of Contents 8 ...
Page 12: ...1 Welcome 10 ...
Page 48: ...3 Description 46 ...
Page 96: ...5 Operation 94 ...
Page 99: ...6 Maintenance 97 Lubrication and Oiling Plan Boom Width 80 100 10 10 10 C 500 C 50 C 50 10 ...
Page 100: ...6 Maintenance 98 Lubrication and Oiling Plan Boom Width 120 10 C 500 C 50 10 ...
Page 129: ...6 Maintenance 127 At the same time adjust the two stop bolts to align the boom sections ...
Page 142: ...6 Maintenance 140 ...
Page 162: ...8 Technical Specifications 160 ...
Page 168: ...Index 166 ...
Page 169: ......