3 - Description
30
TurboFiller
The TurboFiller is used to add chemicals to be mixed with water in the main tank.
Capacity: approximately 9.25 gal. (35 liters).
Before Use
•
Push the lever (arrow) to unlock.
•
Grab the handle to pull the TurboFiller down until it clicks into
locked position.
After Use
•
Push the lever (arrow) to unlock.
•
Lift the TurboFiller back in storage position until it locks.
±
WARNING! Before releasing the lock, always keep a hand on the
grip to avoid abrupt movement of the TurboFiller!
TurboFiller Suction Valve
The valve is used simultaneously with the TurboFiller. The valve has 2
settings: Continuously open or spring-loaded normally closed.
Open the valve by lifting the lever up when chemicals are to be filled
into the TurboFiller and transferred to main tank.
TurboDeflector Valve
This TurboDeflector valve activates the vortex flushing of the TurboFiller.
Lift the lever to lock it in open position for continuous liquid rotation in
the hopper.
Chemical Container Rinsing Lever
The upper lever is used for two purposes.
1.
When the TurboFiller lid is open:
For rinsing empty containers. Place the container over the rotating
flushing nozzle in the middle of the TurboFiller to rinse the inside
of the container.
2.
When the TurboFiller lid is closed:
Use the lever to rinse the hopper after the filling of chemicals is
completed.
€
DANGER! Do not activate this lever unless the multi-hole nozzle is covered by a container, or the TurboFiller lid is
closed, to avoid spray liquid hitting the operator! Risk of injuries and spillage on the ground.
Summary of Contents for COMMANDER 5500
Page 2: ......
Page 4: ......
Page 10: ...Table of Contents 8 ...
Page 12: ...1 Welcome 10 ...
Page 48: ...3 Description 46 ...
Page 96: ...5 Operation 94 ...
Page 99: ...6 Maintenance 97 Lubrication and Oiling Plan Boom Width 80 100 10 10 10 C 500 C 50 C 50 10 ...
Page 100: ...6 Maintenance 98 Lubrication and Oiling Plan Boom Width 120 10 C 500 C 50 10 ...
Page 129: ...6 Maintenance 127 At the same time adjust the two stop bolts to align the boom sections ...
Page 142: ...6 Maintenance 140 ...
Page 162: ...8 Technical Specifications 160 ...
Page 168: ...Index 166 ...
Page 169: ......