6 - Maintenance
126
Procedure
1.
Remove the bolt, nut and washers connecting the hydraulic cylinder to the hinge point.
Disconnect the hydraulic cylinder and move it away from the hinge point.
2.
The aluminum boom part is aligned horizontally by adjusting the two M34 ram eyes.
Use a bubble level to check the alignment.
Once the boom is aligned horizontally, tighten the M34 nuts just slightly.
Summary of Contents for COMMANDER 5500
Page 2: ......
Page 4: ......
Page 10: ...Table of Contents 8 ...
Page 12: ...1 Welcome 10 ...
Page 48: ...3 Description 46 ...
Page 96: ...5 Operation 94 ...
Page 99: ...6 Maintenance 97 Lubrication and Oiling Plan Boom Width 80 100 10 10 10 C 500 C 50 C 50 10 ...
Page 100: ...6 Maintenance 98 Lubrication and Oiling Plan Boom Width 120 10 C 500 C 50 10 ...
Page 129: ...6 Maintenance 127 At the same time adjust the two stop bolts to align the boom sections ...
Page 142: ...6 Maintenance 140 ...
Page 162: ...8 Technical Specifications 160 ...
Page 168: ...Index 166 ...
Page 169: ......