-SJ -13
4. Loosen the screw with a offset driver and remove the red shipping collars that are equipped on the
both side of the guide bar. (Keep the shipping collars. It is necessary when packing.)
5. Put the carriage and carriage arm together with screw (M4 X 8 2 pcs).
2 pins in the upper carriage arm will fit into holes on the lower carriage.
6. Remove the fixing screw (M3 1 pcs) that fixing the arm indicated by the arrow. (
Keep the
fixing screw.
It is necessary when packing.)
7. Raise slowly the control box to the front then fix it with 2 supplied screws (M4 1 pcs).
8. Connect the cable of carriage to the machine with fixed screw.
9. Install the arm for tubular embroidery. Please refer to (page 6-1) “Installing and removing the frame
base”.
Or, Install the cap frame for the cap embroidery. Please refer to (page 7-2) “Installing and removing
the cap drive frame”.
10. Insert built-in stylus into the holder (slot) of control box.
2_3 V301
2-4a
SETTING UP THE MACHINE
When taking the machine apart in case of packing,
the process is opposite of assembling the machine.
Please do exactly the opposite way of assembling.
When packing the machine up for transportation, be
sure to select the fourth needle and fix it with ship
-
ping collars on the both side of the guide bar.
4
5
7
10
8
6
Summary of Contents for HCH Plus
Page 2: ......
Page 127: ...D2 117 13 6 FRAME CONFIRMATION 20_5 NB01 11 Press Press to return to Drive mode...
Page 254: ...RA 110 26 3 BUILT IN FONT LIST 26_3 P401 Basic script Diacritic script...
Page 255: ...RA 111 26 3a BUILT IN FONT LIST 26_3a P401...
Page 300: ......
Page 314: ......
Page 341: ...HCH HCS HCD HCU ONE TOUCH FRAME 7 1 FOPC01 1 12 13 14 2 6 3 B 11 C 9 4 E A 3 4 D C 8 7 5 10...
Page 354: ......