STRATTON MK3 - Installation, Use and Maintenance
Diagram: MK3-3
page 5 / 6
F. SPECIFIC START-UP PROCEDURE
"
Correctly install and connect the electrical connections.
"
Make the settings below in "specialist" mode:
Line No. Value
• Time and date
menu
Set the time
Hour / minute (1)
HH.MM
Set the date
Day / month (2)
DD.MM
Set the year
Year (3)
YYYY
•
Configuration
menu
Configure the secondary flow sensor
BX2 sensor input (5931)
B10 line output sensor
Start up heating circuit 1
Heating circuit 1 (5710)
Start
Start up heating circuit 2
Heating circuit 2 (5715)
Start
Start up heating circuit 3
Heating circuit 3 (5721)
Start
Configure the alarm output
Relay output QX1 (5890)
Alarm circuit K10
Configure the DHW tank pump output
Relay output QX2 (5891)
DHW pump Q3
Configure the direct circuit pump Q2
Relay output QX3 (5892)
Pump CC1 Q2
Configure the extension modules
Extension module function 1 (6020)
Heating circuit 2
Extension module function 2 (6021)
Heating circuit 3
Save the sensors so that they are taken
into account by the system
Save sensor (6200)
Yes (switches back to
no automatically)
OK
OK
Short press
Press for 3 seconds
End user
Start-up
Specialist
OEM
IMPORTANT:
configure the switches on the AGU 2.550 extension modules.
Summary of Contents for STRATTON MK3 Series
Page 2: ......
Page 13: ...06 02 2023 13 154 STRATTON MK3 Installation Use and Maintenance...
Page 44: ...44 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C Figure 19 Wiring diagram...
Page 45: ...06 02 2023 45 154 STRATTON MK3 Installation Use and Maintenance...
Page 149: ...06 02 2023 149 154 STRATTON MK3 Installation Use and Maintenance...
Page 150: ...150 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Page 151: ...06 02 2023 151 154 STRATTON MK3 Installation Use and Maintenance...
Page 152: ...152 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Page 153: ...06 02 2023 153 154 STRATTON MK3 Installation Use and Maintenance...