06.02.2023
137 / 154
STRATTON MK3 - Installation, Use and Maintenance
12.1.4. UIN 235787 PWM TO 0-10V CONVERTER KIT FITTING INSTRUCTIONS
Refer to the relevant sections of the Boiler installation manual as required
when carrying out the installation.
12.1.4.1. Installation
Install the kit as follows:
On the AGU2.551A109,
• Set slope 1 adjustment to full anticlockwise
• Mode UX42 jumper should be left set to position b, it has no influence on
the operation of channel 1
This is the default factory setting
Attach the AGU 2.551A109 into a vacant clip-in space into the support holes
between the electrical connections, only 2 clip-in devices or one clip-in and
a VFC pump control relay may be fitted at any one time. Externally mounted
option kits are available if required.
Install the supplied plug into the lower connection, X2
12.1.4.2. Boiler wiring
Mains voltage side
PELV side
Summary of Contents for STRATTON MK3 Series
Page 2: ......
Page 13: ...06 02 2023 13 154 STRATTON MK3 Installation Use and Maintenance...
Page 44: ...44 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C Figure 19 Wiring diagram...
Page 45: ...06 02 2023 45 154 STRATTON MK3 Installation Use and Maintenance...
Page 149: ...06 02 2023 149 154 STRATTON MK3 Installation Use and Maintenance...
Page 150: ...150 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Page 151: ...06 02 2023 151 154 STRATTON MK3 Installation Use and Maintenance...
Page 152: ...152 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Page 153: ...06 02 2023 153 154 STRATTON MK3 Installation Use and Maintenance...