74
Clean original fastener threads (or replace with the correct new fasteners)
1.
and volute screw hole threads. (Loctite Clean-up Solvent)
Apply Loctite™ 243 (or equivalent) to threads of fasteners.
2.
Hand start twelve (12) 7/16 — 14 UNC x 1.25-in bolts that hold volute to
3.
pump head.
Using a 5/8-in wrench (or ratchet wrench or pass thru ratchet) tighten
4.
(CW) twelve (12) 7/16 — 14 UNC x 1.25-in bolts.
Using circular pattern, torque twelve (12) 7/16 — 14 UNC x 1.25-in bolts.
5.
Refer to Table 22 for recommended torque values for fastener size and
material.
D.
Connect mounting bracket(s) as noted/match marked.
E.
Connect any electrical wiring according to tags.
F.
Connect all suction, discharge, and cooling tubing and piping as noted/match
marked.
G.
Perform paragraph 4.4.4.1.3, Performance Testing Test Procedure, to verify
repair complete and pump in working condition. Repair any leaks or prob-
lems.
H.
Update maintenance log entries.
I.
Place apparatus in service in accordance with departmental procedures.
5.8.4.4
CBP Volute R&R
The primary difference between the CBP and the AP/MBP volute removal is the number of
screws that hold the volute to the pump head, the CBP uses only eight (8) 3/8-in–16 by 0.88 in
long screws instead of the twelve (12) larger screws.
NOTE
If the joint between the volute and the pump head appears to be leaking water or the
volute is damaged, volute removal is required. If a leak is indicated, water staining
will appear on the paint between the assemblies. Additionally mineral deposits may
also indicate a leak at the joint.
Refer to Table 28 for a list of tools and/or consumables required for this procedure.
Table 28.
CBP Volute R&R Tools And Consumables List
Standard Tools
Special Tools
Consumables
PPE
(Eye and Hand Protection)
None
Shop Rag(s) (As Required)
Gasket Scraper
Loctite™ 243 (Or Equivalent)
9/16-in Wrench
(Or Ratchet Wrench)
(Or Pass Thru Ratchet)
Volute: (ONLY ONE REQUIRED – SELECT FROM: )
< See FSG–PL–01482 Sheet 4 Item 1>
9/16-in Torque Wrench
O-ring Lubricant (See Table 20 )
Summary of Contents for AP
Page 2: ......
Page 28: ......
Page 71: ...59 Figure 19 One Piece Volute AP CBP MBP Figure 20 Three Piece Volute RSD...
Page 73: ...61 Figure 21 AP Pump Exploded View...
Page 74: ...62 Figure 22 CBP Pump Exploded View...
Page 75: ...63 Figure 23 MBP Pump Exploded View...
Page 76: ...64 Figure 24 RSD Pump Exploded View...
Page 77: ...65 Figure 25 Gearbox Exploded View All Except 3 74 1 GR...
Page 78: ...66 Figure 26 Gearbox Exploded View 3 74 1 GR...
Page 158: ...146 THIS PAGE INTENTIONALLY BLANK...
Page 174: ...C 12 THIS PAGE INTENTIONALLY BLANK...
Page 176: ...D 2 DATE HOURS RUN MAINTENANCE PROBLEM PART S USED REASON REPLACED INITIALS...