C-11
DO NOT LUBRICATE VANES OR VANE SLOTS. USING LUBRICANT ON THE VANES OR
VANE SLOTS DURING DISASSEMBLY, CLEANING, OR ASSEMBLY EVENTUALLY CAUS-
ES A GUMMY RESIDUE TO DEVELOP, RENDERING THE SYSTEM INOPERATIVE.
Slide new vanes into slots in rotor.
3.
Rotate rotor and shaft, verify vanes move freely in rotor slots.
4.
NOTE
If required, install new pins in the pump head assembly.
B.
Install pump head onto pump body.
Align pins with holes in pump body and slide pump head over rotor/shaft.
1.
Once head is seated against pump body, make sure rotor turns freely in
2.
pump.
C.
Install motor on pump and secure.
Install one (1) 3/8-in –16 UNC X 2-1/2 in long bolt.
1.
NOTE
Install wiring according to tags/notes/match marks.
Install nut (3/8-in –16 UNC) to connect pump head to pump body.
2.
Tighten nut and bolt. See Table 22.
3.
D.
Connect hose(s) according to tagging.
E.
Connect wiring according to tagging.
F.
Install primer on mounting point and secure primer according to OEM instruc-
tions.
Summary of Contents for AP
Page 2: ......
Page 28: ......
Page 71: ...59 Figure 19 One Piece Volute AP CBP MBP Figure 20 Three Piece Volute RSD...
Page 73: ...61 Figure 21 AP Pump Exploded View...
Page 74: ...62 Figure 22 CBP Pump Exploded View...
Page 75: ...63 Figure 23 MBP Pump Exploded View...
Page 76: ...64 Figure 24 RSD Pump Exploded View...
Page 77: ...65 Figure 25 Gearbox Exploded View All Except 3 74 1 GR...
Page 78: ...66 Figure 26 Gearbox Exploded View 3 74 1 GR...
Page 158: ...146 THIS PAGE INTENTIONALLY BLANK...
Page 174: ...C 12 THIS PAGE INTENTIONALLY BLANK...
Page 176: ...D 2 DATE HOURS RUN MAINTENANCE PROBLEM PART S USED REASON REPLACED INITIALS...