67
Transportation
• In transportation, please don't dismantle the packaging, and move the unit to the installation location as closely as
possible.
• Don't hang the unit only at two points. When hanging the unit, don't sit on the unit. The unit should be upright.
When removing the unit with the forklift, put the fork into the special hole at bottom of the unit. When being
hanged, the rope should be 4 pieces of steel cable with over 8mm diameter. Put the cushion at the contact
section between steel cable and the unit against the distortion or damage.
•
When ring unit use hosting hole at base of unit. Protect unit against riging
damage by using cusion.
Forklift hole
distance
480mm
Hoisting hole diameter Ø40mm, distance730mm
AV08~14IMVURA
Forklift hole
distance
480mm
Hoisting hole diameter Ø40mm, distance1042mm
AV16~22IMVURA
Steel cable
Cushion
Hoisting hole
Summary of Contents for MRV 5-RC AB052MAERA
Page 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Page 3: ......
Page 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Page 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Page 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Page 116: ...113 2 Preparation before installation ...
Page 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Page 165: ...162 One by four valve box PCB code 0151800466 ...