121
(Note1):
Auxiliary pipe
-1,2,3: Install the flare nuts first and then use the auxiliary pipe after being flared in the field.
Fig.14
Fig.15
Fig.16
280B
The total capacity of the indoor unit in the downstream is more than 18.0 kW but less than 22.4 kW.
The total capacity of the indoor unit in the downstream is more than 22.4 kW but less than 28.0 kW.
Enlarge pipe
Flare nut (*2)
Gas pipe (*1)
Valve box (Top side)
Flare nut (*2)
HP gas pipe (*1)
Suction gas pipe (*1)
Liquid pipe (*1)
Auxiliary pipe
-3
Auxiliary pipe
-1
Auxiliary pipe
-1
Flare nut (*2)
Gas pipe (*1)
Liquid pipe (*1)
Flare nut (*2)
HP gas pipe (*1)
Suction gas pipe (*1)
Liquid pipe (*1)
Auxiliary pipe
-2
Auxiliary pipe
-2
Flare nut (*2)
Gas pipe (*1)
Liquid pipe (*1)
Valve box (Top side)
Summary of Contents for MRV 5-RC AB052MAERA
Page 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Page 3: ......
Page 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Page 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Page 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Page 116: ...113 2 Preparation before installation ...
Page 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Page 165: ...162 One by four valve box PCB code 0151800466 ...