120
Note : Due to the HP gas pipe and suction gas pipe size of 180B valve box is the same, so during installation,
please confirm the HP gas pipe and suction gas pipe between outdoor and valve box( such as by sending nitrogen
into the HP gas pipe and suction gas), then connect suction gas pipe to the suction gas pipe of valve box, HP gas
pipe to the HP gas pipe of valve box.
Fig.11
Fig.12
Fig.13
180B
The total capacity of the indoor units in the downstream is more than 11.2 kW but less than 16.8 kW.
The total capacity of the indoor units in the downstream is more than 16.8 kW but less than 18.0 kW.
Flare nut (*2)
Valve box (Top side)
Auxiliary pipe
-2
Gas pipe (*1)
Liquid pipe (*1)
Auxiliary pipe
-1
Note
Gas pipe (*1)
Liquid pipe (*1)
HP gas pipe (*1)
Suction gas pipe (*1)
Valve box (Top side)
Liquid pipe (*1)
Flare nut (*2)
Flare nut (*2)
Flare nut (*2)
Valve box (Top side)
Gas pipe (*1)
Liquid pipe (*1)
Auxiliary pipe
-3
Auxiliary pipe
-1
Flare nut (*2)
Flare nut (*2)
HP gas pipe (*1)
Suction gas pipe (*1)
Liquid pipe (*1)
Auxiliary pipe
-1
Valve box (Top side)
Gas pipe (*1)
Liquid pipe (*1)
Flare nut (*2)
HP gas pipe (*1)
Suction gas pipe (*1)
Liquid pipe (*1)
Auxiliary pipe
-2
Auxiliary pipe
-2
Valve box (Top side)
Flare nut (*2)
Gas pipe (*1)
Liquid pipe (*1)
Summary of Contents for MRV 5-RC AB052MAERA
Page 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Page 3: ......
Page 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Page 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Page 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Page 116: ...113 2 Preparation before installation ...
Page 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Page 165: ...162 One by four valve box PCB code 0151800466 ...