81
Pipe diameter
D
Bending radius
R
Vertical heigh
H
Ø19.05
≥31
≤150
Ø22.22
≥31
≤150
Ø25.4
≥45
≤150
Ø28.58
≥45
≤150
Ø31.8
≥60
≤250
Ø38.1
≥60
≤350
Ø41.3
≥80
≤450
Ø44.5
≥80
≤500
Ø50.8
≥90
≤500
Ø54.1
≥90
≤500
R
H
D
R
H
D
In order to avoid damage to the pipe, the size of the return bend is referred to as the drawing.
Compressor oil will flow into
the lowest unit
Proper installation
Wrong installation
Oil return bend
The height of the vertical
section see schedule
requirements
Summary of Contents for MRV 5-RC AB052MAERA
Page 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Page 3: ......
Page 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Page 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Page 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Page 116: ...113 2 Preparation before installation ...
Page 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Page 165: ...162 One by four valve box PCB code 0151800466 ...