135
(2) Inspection upon delivery
Inspection item
Inspection column
If the electric box cover is installed
If the installation specification is transferred to the customer
Inspection item
Pay much attention to the following during installation. Check them again after completion.
(1) Inspection items after installation
Inspection item
Defect
Inspection column
If the installation of valve box is secure ?
Falling off, vibration and noise
If gas leakage inspection is completed ?
No heating/cooling
If complete insulation is achieved (refrigerant piping
and tubing connections) ?
Water leakage
If the voltage of the power supply is consistent with
that on the nameplate ?
Out of service, burnt
If there is improper wiring or piping ?
Out of service, burnt
If there is construction without grounding ?
If the thickness of the wire is as specified ?
Out of service, burnt
VP4-450B
Auxiliary pipe
Wiring
harness
Insulation tube
Quantity
2
1
42
4
4
4
4
Shape
-9
Ø16.1
Ø22.22
-10
Ø19.2
Ø22.22
Ø10
Ø16
Ø28
Ø46
Summary of Contents for MRV 5-RC AB052MAERA
Page 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Page 3: ......
Page 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Page 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Page 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Page 116: ...113 2 Preparation before installation ...
Page 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Page 165: ...162 One by four valve box PCB code 0151800466 ...