2. Preparation before installation
(1) Valve box dimension (mm)
(2) Lifting dimension of valve box
See the Fig.4 to install the lifting bolts and hoisting tools.
• Use the lifting bolts with the size of M8~M10
• Press insert for new settings. Press hole in anchor if set. Ensure that it can sufficiently
withstand the weight of the valve box before installation.
Fig.3 Pitch of lifting bolts
Fig.4
Thick cement plate
Foundation bolt
Lifting tools
Valve box
Less than 1m
Less than 1m
Lifting bolt
Long nuts or turnbuckle
Note: All the parts in the
figure are purchased locally.
290
67
410
220
567
137
160
189
57
144
109
Fig.2
262
159
159
212
393
4×22
65 65
65 65 65 44
65 76
4×52
67
156
830
455
Summary of Contents for MRV 5-RC AB052MAERA
Page 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Page 3: ......
Page 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Page 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Page 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Page 116: ...113 2 Preparation before installation ...
Page 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Page 165: ...162 One by four valve box PCB code 0151800466 ...