Installing the Unload Tube Flight
1. Begin by removing the tube end cap if you have not already done so.
2. Insert the flight (32) into the tube (2) with the square bushing end facing the center well and the
round bushing end facing the discharge end of the tube.
Figure 3-30
Installing the flight into unload tube
2
Unload tube
32
Flight
3. When the flight (32) is approaching the center well shaft, it will be necessary to rotate flighting
counterclockwise in order to get it to seat properly on the square shaft (33). When the flight is
properly seated, the flight should be entirely inside the unload tube. It may be necessary to pull the
flight out, a small amount and attempt this step multiple times in order to seat the flight properly.
Figure 3-31
Attaching the flight to the center well shaft
32
Flight
33
Gearbox
4. Open the center well gate and enter the bin to check and see that the flight is seated.
PNEG-2108
8" and 10" Standard Duty and IW Standard Duty
39