Installing the Bin Flange
1. Attach the upper bin flange (6) and lower bin flange (7) loosely to the unload tube using HHCS bolts
(8) and serrated flange nuts (9).
Figure 3-7
Installing the upper and lower bin flanges
6
Upper bin flange
8
5/16 x 1-1/2 in. HHCS bolt
7
Lower bin flange
9
5/16 in. serrated flange nuts
2. With the flange not yet attached to the bin wall, make sure that the bin wall opening is large enough
for the clutch and well control rods to pass through the bin wall.
3. Slide the bin flanges flush up to the bin wall and tighten the bolts connecting the two flanges.
4. Drill holes in the bin wall through the four holes located in the upper bin flange (6) and two holes
located in lower bin flange (7) and secure the bin flanges to the bin wall using six bin standard bolts
(A) and flange nuts (B).
Figure 3-8
Secure the upper and lower bin flanges
6
Upper bin flange
A
Standard bin bolt
7
Lower bin flange
B
Flange nut
PNEG-2108
8" and 10" Standard Duty and IW Standard Duty
23