Engaging the Clutch for Bin Sweep
1. All power should be OFF and locked out before starting.
2. Close the intermediate wells.
3. Remove the pin (16) from the clutch handle (30).
4. Pull the clutch handle (30) away from the bin to engage the gearbox clutch.
Figure 4-7
Engaging the clutch
16
Lock pin
29
Clutch handle pivot
21
Clutch control rod
30
Clutch handle
Letter
How to operate
Sweep operating instructions
A: Auxiliary well
control
Pull to open (if equiped)
IMPORTANT:
Before filling bin, close center well and
intermediate well gates
Instructions:
a. Be sure power sweep clutch control is
DISENGAGED
and ensure locking pin is inserted.
b. Start unloading auger. Open center well gate.
c. When grain stops flowing from center well gate,
close center well gate and open intermediate
wells.
d. When grain stops flowing from intermediate wells,
stop auger and close intermediate wells. Engage
power sweep and open center well gate. Start
auger.
C: Center well control
To open, rotate handle
so rod pulls out of bin
I: Intermediate well
control
To open, rotate handle
so rod pulls out of bin
CL: Power sweep
clutch control
Pull handle to engage
power sweep
OI: Outer intermediate
well control
To open, rotate handle
so rod pulls out of bin
(available only for 10 in.
HD sweeps for 42 ft –
72 ft. bins)
56
PNEG-2108
8" and 10" Standard Duty and IW Standard Duty