Installing the Intermediate Well Flange
1. Place the intermediate well flange (77) onto the intermediate well.
2. Install self-drilling screws (13) to secure the intermediate well flange (77) to the bin floor.
Figure 3-32
Installing the intermediate flange well
13
Self-drilling screws
77
Intermediate well flange
After You Finish
Repeat the above procedure to install the intermediate well flange in all the remaining intermediate wells.
40
PNEG-2108
8" and 10" Standard Duty and IW Standard Duty