NOTE:
• Make sure to partially pull the intermediate gate (69) out to allow gap for removing the
bolts (60) and nuts (9) inside the intermediate well (65) in a 10 in. sweep
• Make sure to remove the gate clamp (12), pin (15), bolts (13), washers (14) and in.
nuts (9) at the outside of the intermediate well to remove the intermediate gate in a 10
in. sweep
Figure 3-13
Removing the intermediate gate (10 in. sweep)
9
5/16 in. serrated flange nut
15
5/16 x 1-3/4 in. roll pin
12
Control rod clamp
60
5/16 x 3/4 in. flange bolt
13
5/16 x 3/4 in. carriage bolts
65
Intermediate well
14
5/16 in. flat washer SAE
69
Intermediate well gate
28
PNEG-2108
8" and 10" Standard Duty and IW Standard Duty