Installation and operating instructions
Original installation and operating instructions
CONTENTS
Page
1.3.1 Qualification and training
1.3.2 Obligations of the operating company
1.3.3 Obligations of the certified service persons
2.1.1 Personal protective equipment
2.1.2 Sodium hypochlorite solution
Selcoperm electrolysis system (SES)
4.1.3 Safety and monitoring equipment
4.1.6 Piping and Instrumentation Diagram (PID)
4.2.4 Overview hydraulics SES-5000 to SES-15000
4.2.5 Overview hydraulics SES-20000 to SES-45000
Selcoperm Electrolysis System (SES)
5.1.1 Water quality specification
5.2.2 Built-in control cabinet
5.2.7 Dimensions SES-5000 to SES-15000
5.2.8 Dimensions SES-20000 to SES-45000
5.3.1 Technical data for air-cooled rectifier
5.3.2 Technical data for water-cooled rectifier
6.2.2 Foundation and space requirement
6.2.13 Degassing and storage tank
6.2.14 Connection of venturi nozzle (VN) and flow sensor
Dismantling and reassembling the Selcoperm
electrolyser housing
6.4.1 Electrical connection of the Selcoperm control cabinet 37
6.4.2 Electrical connection of the brine dosing station
6.4.3 Electrical connection of the degassing and storage
6.4.4 Electrical connection of degassing fans (EF4.01,
6.4.5 Electrical connection of rectifier (REC)
7.1.3 Degassing and storage tank
7.1.4 Preparing the brine dosing station (BDS)
7.1.5 Checking the system configuration
Starting up the system initially
7.2.1 Adjusting the manual valves
7.2.2 Adjusting the total flow rate
7.2.3 Adjusting the brine dosing pumps
7.2.4 Checking and adjusting the soft water flow and the
7.2.5 Checking and adjusting cell outlet level switches (1.09,
7.2.6 Checking and adjusting NaClO level switch (4.04)
Switching to operation mode "Automatic"
7.4.1 Degassing and storage tank