English (GB)
3
1. General information
1.1 Documentation package
The documentation delivered with the Selcoperm electrolysis
system comprises:
• Installation and operating instructions for Selcoperm
• Separate supplier manuals for built-in components
• Wiring diagrams (in control cabinets).
The complete documentation package must be available at the
installation location at all times.
1.2 Scope of this document
The Selcoperm electrolysis system comprises a number of
components. The core components must be purchased from
Grundfos to ensure the compliance with the Selcoperm safety
concept. These core components are:
• Selcoperm electrolyser
• Rectifier
• Brine dosing station
• Degassing and storage tank with a special installation set
including the degassing fan
• Acid cleaning station.
The Selcoperm safety concept requires a gas warning system for
hydrogen, which must meet specific requirements.
Further components required for the system are:
• Water softener
• Brine tank.
In addition, a chiller or heater can be required to achieve the
specified water inlet temperature. All mentioned components can
be purchased from Grundfos. For details see section
This document contains detailed information on the core
components and their installation, and on general requirements
for additional components and their installation. The requirements
for components and their installation described in this document
must be adhered to, no matter if the components were purchased
from Grundfos or not. The documentation package delivered with
the Selcoperm system contains additional documents for
components, which must be observed.
8.5.4 Acknowledge fault messages
Configuration of system capacity
Settings delay-/flushing times
Settings Operating hours Counter plant
Settings Operating hours Counter lines
Basic maintenance schedule (users)
9.3.2 Checking the water hardness of the softened water
9.3.3 Checking the NaClO solution
9.3.4 Checking the salinity of the electrolyte
Advanced maintenance schedule (certified service
persons)
9.4.1 Checking the system for hydrogen gas leakages
9.4.2 Retightening the DC connections
9.4.3 Replacing the gaskets in the electrolysis cells and in
9.4.4 Dismantling and reassembling level switches (1.09,
9.4.5 Dismantling and reassembling level switch (4.04)
9.5.1 Interval for acid cleaning
9.5.2 Performing the acid cleaning
Short-term decommissioning up to 4 weeks
Decommissioning up to 6 months
Decommissioning for more than 6 months
Flushing the system with softened water
Flushing the brine dosing station
12.1.2 Electrolysis cells, DC connection and sensors
Degassing and storage tank and exhaust air line
Prior to installation, read this document. Installation
and operation must comply with local regulations and
accepted codes of good practice.