Reverse osmosis system
AVRO 125 TS/TL
Order no. 185 752 945-inter Edited by: nkes-mrie :\BA-752945-INTER_185_AVRO_125.DOCX
45
Note:
The maintenance work performed must be documented in the
checklist, refer to appendix "Operation log"
3.1
Operation log
The operation log is located in chapter H, point 4 of this operation
manual. When commissioning the system, make sure to record all
data on the cover sheet of the operation log and fill in the first column
of the checklist.
The customer service technician will fill in a column of the check list
whenever maintenance is performed. This document provides
evidence of proper maintenance.