Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE
177
3. Disassemble the heat
exchanging board.
●Heat the connecting pipes of the heat
exchanging board by acetylene welding and
then remove the pipes.
Note: Avoid nearby parts from being burnt
during welding. The joints of the board must be
welded with copper plated steel. Ensure welding
quality.
4. Remove the heat
exchanging board.
●Unscrew the support of the heat exchanging
board, and remove the support and board.
5. Install a new heat
exchanging board.
●Screw the support of the heat exchanging
board and fix the board onto the chassis.
●Put the heat exchanging board based on the
position of the suction and discharge pipes and
weld the pipes with the heat exchanging board.
●During welding, charge nitrogen into the pipes.
The pressure should be controlled within
0.5±0.1 kgf/cm
2
(relative pressure).
Note: Avoid nearby parts from being burnt
during welding.
6. Fix and wire the electric
box.
●Put the electric box back to original position
and screw it.
●Connect all lines.
Summary of Contents for Ultra Heat GMV-VQ72W/A-F
Page 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Recovery Series ...
Page 30: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 26 ...
Page 73: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 69 ...
Page 135: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 131 ...
Page 203: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 199 5 4 NCHS4B U ...
Page 205: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 201 5 5 NCHS8B U ...
Page 207: ...Jf00303410 ...