
Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE
171
7. Check and install the front
panels.
●Check various parts and connecting lines.
●If no problem is found, hook the front panels
and tighten the screws.
Electric expansion valve
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected
Step
Diagram
Operation Procedure
1. Loosen the hooks at the
bottom of the electric box
and the screws.
●Use a screwdriver to unscrew the upper and
lower front panels.
●Lift the front panels in order to take it out.
Note: Both the upper panel and lower panel are
fixed with two fasteners respectively to connect
to the side panels.
2. Remove the electric box.
●Disconnect internal and external connecting
lines of the electric box.
●Protect the internal parts during the
disassembly.
3. Disassemble the electric
expansion valve.
●Remove the coil from the electric expansion
valve.
●Heat the connecting pipes of the electric
expansion valve by welding and remove the
pipes.
Note: Avoid nearby parts from being burnt
during welding.
Summary of Contents for Ultra Heat GMV-VQ72W/A-F
Page 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Recovery Series ...
Page 30: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 26 ...
Page 73: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 69 ...
Page 135: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 131 ...
Page 203: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 199 5 4 NCHS4B U ...
Page 205: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 201 5 5 NCHS8B U ...
Page 207: ...Jf00303410 ...